I've seen the same mistake hundreds of times
In my role coordinating urgent parts orders for underground mining operations, I've processed over 200 rush orders in the last five years. And I can tell you this: preventive maintenance on your Epiroc equipment isn't a nice-to-have—it's the single biggest cost lever you're ignoring.
It's tempting to think: "We'll just fix it when it breaks. That's what the service team is for." But that logic ignores one brutal reality—emergency repairs are always more expensive than the maintenance you skipped. Always.
Here's what actually happens during a breakdown
Last quarter alone, we processed 47 rush orders, and 42 of them were for parts that should have been replaced during scheduled maintenance. Let me give you a concrete example.
In March 2024, a client called at 5:45 PM on a Thursday. Their Epiroc Scooptram ST14 had lost hydraulic pressure—turned out a seal kit failed. Normal lead time for that seal kit is 3 business days. They needed it tomorrow morning to avoid a $15,000 per hour production penalty. We scrambled, found a vendor who could overnight it, paid $840 in rush fees (on top of the $320 base cost), and the part arrived at 7:30 AM Friday. The client's alternative was losing $180,000 in a 12-hour shutdown. They "saved" on preventive maintenance... and then paid 3x the part cost just in expediting.
That's not unusual. In my experience, every dollar saved on preventive maintenance translates to $4–6 spent on emergency repairs when you factor in rush shipping, overtime labor, and lost production.
The blind spot most buyers miss
Most mining operations focus on the purchase price of the equipment. They ask: "What does a new Scooptram ST14 cost?" or "What's the Epiroc design engineer salary if we hire one?" (By the way, Epiroc design engineers are well-compensated—but their designs are only as good as the maintenance program that supports them.)
The question they should ask is: "What's the total cost of operation over 10 years including planned and unplanned maintenance?" That's where preventive care shines. A simple 12-point checklist I created after my third mistake—checking hydraulic fluid levels, filter condition, hose wear, bolt torque—has saved us an estimated $8,000 in potential rework per machine per year.
And it's not just parts. Preventive maintenance catches issues like misaligned drivelines or worn bushings before they cause cascading failures. I've seen a $50 bushing replacement turn into a $12,000 axle replacement because nobody checked it during the quarterly service. (Ugh.)
The argument against: "But we can't afford the downtime!"
I hear this all the time: "We can't shut down our production for a day to do inspections. We need every hour of uptime." That's logical on the surface, but it ignores a key fact: planned downtime is 5–10x less costly than unplanned downtime.
Consider this: A typical preventive maintenance window for a Scooptram ST14 takes 4–6 hours. The production loss might be $5,000–$10,000. Compare that to an emergency breakdown that stops the machine for 24–48 hours while you wait for parts. That's $30,000–$100,000 in lost production plus the expedited parts cost. The math is straightforward.
And the most painful? When a breakdown happens underground, you also have to recover the machine—that's a whole separate cost in logistics and safety protocols.
What I've learned from 200+ rush orders
Our company lost a $250,000 contract in 2022 because a client tried to save $1,200 on a scheduled service for their Epiroc ST14. The machine failed mid-project, and the delay cost them their follow-up placement. That's when we implemented our '48-hour buffer' policy: any client who doesn't have at least 48 hours of buffer stock on critical wear items gets a warning call from me.
5 minutes of verification beats 5 days of correction. That's not a cliché—it's a rule I've learned the hard way. The most effective maintenance programs I've seen all share one thing: a simple, consistent checklist and the discipline to follow it.
So next time someone tells you preventive maintenance is a waste of money, ask them: "How much did your last emergency repair cost?" Then compare it to what you'd spend on quarterly inspections. I'm betting the answer will change your mind.
Discuss this topic with Epiroc
If the article connects to an active drilling or automation project, share your context and our team will route the note to the right technical contact.
Tell us about your drilling program
Share the operating context so Epiroc can respond with useful equipment, automation, service, or sustainability guidance.